Monday, July 29, 2013

Airline Route - 14 new posts


Airline Route - 14 new posts

Link to Airline Route

Posted: 20 Apr 2012 03:30 AM PDT
Update at 1030GMT 20APR12
As per 20APR12 GDS timetable and inventory display, Air India is extending Boeing 777-300ER operation on Mumbai – London Heathrow route. The 777-300ER operation is now scheduled until 15JUN12, instead of 30APR12.
777-200LR aircraft to operate this route from 16JUN12. Schedule:

AI131 BOM0630 – 1130LHR 77W D
AI130 LHR1315 – 0305+1BOM 77W D

Filed under: 2012, Air India
Posted: 20 Apr 2012 03:10 AM PDT
Update at 1010GMT 20APR12
Virgin Australia starting 03MAY12 is cancelling service on Gold Coast – Townsville route, currently operated by Embraer E190 aircraft three times a week. Schedule until 02MAY12 as follows:

DJ1827 OOL1055 – 1305TSV E90 13
DJ1829 OOL1155 – 1405TSV E90 6
DJ1832 TSV1615 – 1815OOL E90 13
DJ1834 TSV1735 – 1935OOL E90 6

Filed under: 2012, Virgin Australia
Posted: 20 Apr 2012 02:50 AM PDT
Update at 0950GMT 20APR12
From 15MAY12, Mandarin Airlines is changing operational schedules on Taipei Taoyuan – Kalibo 4 weekly service. From this date, departure time will be unified to morning departure. Currently 2 of 4 weekly flights operating in the afternoon hours.
Schedule:

till 14MAY12
AE969 TPE0705 – 0935KLO 738 47
AE2969 TPE1210 – 1440KLO 738 25
AE970 KLO1035 – 1300TPE 738 47
AE2970 KLO1540 – 1805TPE 738 25
eff 15MAY12
AE2969 TPE0705 – 0935KLO 738 25
AE969 TPE0705 – 0935KLO 738 47
AE2970 KLO1035 – 1300TPE 738 25
AE970 KLO1035 – 1300TPE 738 47
Service operated by China Airlines Boeing 737-800 aircraft

Filed under: 2012, Mandarin Airlines
Posted: 20 Apr 2012 02:30 AM PDT
Update at 0930GMT 20APR12
LANPeru from 16APR12 to 30AUG12 is launching Tarapoto – Iquitos service, on board Airbus A319 aircraft. This sector is part of the triangle routing of Lima – Tarapoto – Iquitos – Lima and vice versa, which operates twice weekly.
Schedule:

LA2391 LIM1320 – 1510IQT1540 – 1645TPP1715 – 1830LIM 319 14
LA2390 LIM1355 – 1520TPP1550 – 1655IQT1725 – 1905LIM 319 14

Filed under: 2012, LAN, oneWorld
Posted: 20 Apr 2012 02:10 AM PDT
Update at 0910GMT 20APR12
Ryanair on 12APR12 announced it’ll be cutting services from Edinburgh, due to the high costs charged by the operator BAA, claimed by the airline. The airline will cancel 8 routes in Winter 2012 from Edinburgh:

Edinburgh – Bratislava
Edinburgh – Bremen
Edinburgh – Fuerteventura
Edinburgh – Gothenburg
Edinburgh – Hahn
Edinburgh – Kaunas
Edinburgh – Lodz
Edinburgh – Poznan

Filed under: 2012/13, Ryanair
Posted: 20 Apr 2012 01:50 AM PDT
Update at 0850GMT 20APR12
Libyan Airlines yesterday (19APR12) resumed Tripoli – Malta service, using leased Airbus A320 aircraft to bypass recent ban by the EU. This route operates twice a week.
Schedule:

LN146 TIP1715 – 1815MLA 320 14
LN147 MLA1915 – 2015TIP 320 14

Filed under: 2012, Libyan Airlines
Posted: 20 Apr 2012 01:30 AM PDT
Update at 0830GMT 20APR12
As per 20APR12 GDS timetable and inventory display, AEROFLOT has made minor adjustment to planned Winter 2012/13 long-haul operation, including the following:

Moscow Sheremetyevo – Beijing Planned service increase to 16 weekly is shelved. Service to maintain 14 weekly in W12
Moscow Sheremetyevo – Miami eff 28OCT12 Planned service resumption with 3 weekly A330-200 service. Reservation is NOT available at this moment
SU110 SVO0900 – 1300MIA 332 246
SU111 MIA1500 – 1110+1SVO 332 246
SU last operated service to MIA on 24MAR00
Previously reported changes:
Moscow Sheremetyevo – Colombo Winter seasonal service operates with Airbus A330-300 twice a week, replaces 767-300 in W11 (Reservation is now open)
Moscow Sheremetyevo – New York JFK 2 Daily flights continuing operation in Winter 2012 season, increases from 1 in W11
SU100 SVO1005 – 1120JFK 763 D
SU102 SVO1535 – 1700JFK 333 D
SU101 JFK1320 – 0745+1SVO 763 D
SU103 JFK1905 – 1325+1SVO 333 D
Moscow Sheremetyevo – Seoul Incheon Airbus A330-300 operates 5 weekly service, replaces 767-300ER in W11
Currently AEROFLOT’s schedule is loaded until 31JAN13.

Filed under: 2012, AEROFLOT, Skyteam
Posted: 20 Apr 2012 01:10 AM PDT
Update at 0810GMT 20APR12
As per 20APR12 GDS timetable and inventory display, Air China from 04JUL12 to 29AUG12 is temporary reducing Shanghai Pu Dong – Milan Malpensa service from daily to 6 weekly. Wednesdays service during this period is cancelled.
Schedule:

CA967 PVG0130 – 0805MXP 330 x3
CA968 MXP1230 – 0550+1PVG 330 x3

Filed under: 2012, Air China, Star Alliance
Posted: 20 Apr 2012 12:40 AM PDT
Update at 0740GMT 19APR12
OLT Express Poland has launched operation on 02APR12, initially with 10 domestic routes within Poland. The airline is expanding its operation starting May 2012, and has announced the expansion to continental Europe starting 29OCT12, from Rzeszow.
The airline’s operational routes are listed below:

Gdansk – Katowice eff 02APR12 5 weekly ATR72
Gdansk – Krakow eff 07MAY12 2 Daily A319
Gdansk – Lodz eff 02APR12 10 weekly ATR72
Gdansk – Poznan eff 02APR12 2 Daily ATR72
Gdansk – Rzeszow 02APR12 – 27SEP12 5 weekly ATR72
Gdansk – Szczecin eff 02APR128 weekly ATR42
Gdansk – Warsaw eff 02APR12 4 Daily (6 Daily from 07MAY12), A319/320 service
Gdansk – Wroclaw eff 02APR12 2 Daily ATR72
Katowice – Poznan eff 14MAY12 6 weekly ATR72
Katowice – Rzeszow eff 02APR12 5 weekly ATR72
Katowice – Szczecin eff 14MAY12 5 weekly ATR72
Krakow – Bydgoszcz eff 02JUL12 10 weekly ATR72
Krakow – Lodz eff 02JUL12 9 weekly ATR72
Krakow – Poznan eff 16APR12 16 weekly ATR72
Krakow – Szczecin eff 14MAY12 16 weekly ATR72
Krakow – Wroclaw 16APR12 – 06MAY12 16 weekly ATR72
Poznan – Rzeszow eff 16MAY12 1 Daily ATR72
Poznan – Szczecin eff 14MAY12 18 weekly ATR72
Poznan – Warsaw eff 02MAY12 10 weekly A320
Poznan – Wroclaw 02APR12 – 06MAY12 6 weekly ATR72
Warsaw – Rzeszow eff 16MAY12 6 weekly ATR72
Warsaw – Szczecin eff 07MAY12 18 weekly A319
Warsaw – Wroclaw eff 02APR12 12 weekly (28 weekly from 06MAY12), A319/320 service
Winter 2012/13 new service, eff 29OCT12 with Airbus A320
Rzeszow – Amsterdam 3 weekly
Rzeszow – Dortmund 3 weekly
Rzeszow – Hamburg 2 weekly
Rzeszow – Memmingen 2 weekly
Rzeszow – Oslo 2 weekly
Rzeszow – Paris Orly 3 weekly
Rzeszow – Rome 3 weekly

Filed under: 2012, 2012/13, OLT Express
Posted: 20 Apr 2012 12:20 AM PDT
Update at 0720GMT 20APR12
Kenya Airways starting 04JUL12 is resuming Nairobi – Eldoret domestic service, where it’ll operate twice a day with Embraer E170 aircraft. Operational schedule:

KQ660 NBO0650 – 0740EDL E70 D
KQ668 NBO1715 – 1805EDL E70 D
KQ661 EDL0820 – 0910NBO E70 D
KQ669 EDL1855 – 1945NBO E70 D

Filed under: 2012, Kenya Airways, Skyteam
Posted: 20 Apr 2012 12:00 AM PDT
Update at 0700GMT 20APR12
As per 20APR12 GDS timetable and inventory display, Kenya Airways starting 25OCT12 is launching Nairobi – Beirut service, which operates three times a week. Boeing 737-700 aircraft operates this service.
Reservation is now open but remains subject to government approval. Schedule:

KQ360 NBO1800 – 2240BEY 73W 146
KQ361 BEY2340 – 0620+1NBO 73W 146

Filed under: 2012/13, Kenya Airways, Skyteam
Posted: 19 Apr 2012 11:40 PM PDT
Update at 0640GMT 20APR12
Air Nigeria from 18MAY12 is resuming service to Johannesburg, after over 3 years of service suspension. The airline will operate Lagos – Johannesburg route 3 times a week, on board Airbus A330-200 aircraft.
The airline previously operated this route as Virgin Nigeria, from 21NOV05 to 17JAN09 with Airbus A340-300 and Boeing 767.
Schedule:

VK303 LOS2350 – 0650+1JNB 332 247
VK302 JNB0915 – 1415LOS 332 135

Filed under: 2012, Air Nigeria
Posted: 19 Apr 2012 11:20 PM PDT
Based on latest GDS timetable and inventory display as of 20APR12, Skyteam member China Eastern Airlines today (20APR12) operates FINAL SCHEDULED Airbus A340-300 service. The airline introduced A340-300 in 1996, replacing MD11 aircraft.
This edition of “Route Profile” gives a quick loo of past A340-300 operation with the airline.


Click here if mobile browser does not support google docs embedded reader.

Filed under: [Route Profile]
Posted: 19 Apr 2012 11:00 PM PDT
Update at 0600GMT 20APR12
As per 20APR12 GDS timetable and inventory display, China Eastern today (20APR12) operates FINAL Scheduled Airbus A340-300 service, Shanghai Pu Dong – Honolulu route. From 24APR12 to 15MAY12, the twice weekly flight will be operated by Airbus A340-600. From 18MAY12, service to be operated by Airbus A330-200.
Schedule:

MU571 PVG1655 – 0910HNL 332 25
MU572 HNL1110 – 1600+1PVG 332 25
A340-600 operates from 24APR12 to 15MAY12

Filed under: 2012, China Eastern, Skyteam

No comments:

Post a Comment

Aviation - Google News

Free Blog Promotion - Blog and Blog resource Directory